Protected: New inspections confirm cracking in Belgium’s Doel-3 reactor pressure vessel

September 4, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: EDF, Areva overhaul UK EPR design review efforts to meet end-year deadline

September 4, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: Greater scrutiny urged for negotiations to subsidise EDF’s Hinkley Point C reactors

July 23, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: Conflict between Treasury and Energy Dept. makes UK energy policy ‘unworkable’

July 23, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: EDF says reported strike price of £165/MWh is “wrong”; DECC silent on upper limit

July 19, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: $10 billion construction contract signed for two AES 2006 Russian reactors in Belarus

July 19, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: Construction license issued for Barakah — United Arab Emirates’ first nuclear reactors

July 19, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: Areva and Rosatom study collaboration in services, fuel, manufacturing nuclear islands

July 18, 2012
By

There is no excerpt because this is a protected post.

Read more »

Protected: Planned 2014 start of Olkiluoto-3 off the table, TVO says, on project 5 years behind schedule

July 17, 2012
By

There is no excerpt because this is a protected post.

Read more »